IE 311 • Midterm II + FinalManufacturing and Service Operations Planning I

“slaytlara çalışırken neyin ne olduğunu bile bilmiyordum örnekler çok yardımcı oldu”

Sudem Yaylacı

Verified

Endüstri Mühendisliği

TED Üniversitesi IE 311 (Manufacturing and Service Operations Planning I) Midterm II + Final sınavına hazırlık paketi.

İşlenen konular: The EOQ Model, EPQ and Quantity Discounts, Material Requirements Planning, Alternative Lot Sizing Techniques, Single Machine Scheduling, Multiple Machine Scheduling.

1799 TL

599 TL a month, 3 instalments at no extra cost

31 past exam questions with solutions
61 topic lessons · 9 h 41 min
5.0 rating
Access for the whole term

Instructor

Ömer Faruk Altun

Ömer Faruk Altun

Co-founder & Head of Education

2011 yılında Endüstri Mühendisliği okumak için başladığım Sabancı Üniversitesi'nden 2018 yılında Bilgisayar Mühendisi olarak mezun oldum. 13 yıldır Altun ismiyle başta Sabancı Üniversitesi olmak üzere çeşitli okullarda Endüstri ve Bilgisayar Mühendisliği alanlarında ders vermekteyim. Unicourse'ta sunduğum derslerin yanında eğitim departmanının da sorumluluğunu üstlenmekteyim.

Topics

Course introduction

Economic Order Quantity

Cost Components

Free

Example 1

Example 2

Lead Time

Example 3

Free

Economic Production Quantity (EPQ)

Example 1

Example 2

All Units Discounts

Free

Example 3

Example 4

Incremental Discounts

Example 5

Example 6

What is MRP?

Bill of Materials (BOM)

MRP Records

Example 1

Example 2

MRP Record Update

Example 3

Example 4

Goals and Assumptions

Lot-For-Lot Method

Economic Order Quantity Method

Periodic Order Quantity Method

Silver-Meal Heuristic

Least Unit Cost Heuristic

Part-Period-Balancing Method

Example 1

Example 2 Part 1

Example 2 Part 2

Wagner Whitin Algorithm

Example 3

Operations Scheduling

Single Machine Scheduling

First Come First Served

Shortest Processing Time

Earliest Due Date

Critical Ratio

Example 1

Moore's Algorithm

Example 2

Lawler's Algorithm

Example 3

LP Model

Example 4

Multiple Machine Scheduling

Finding Makespan in Flow Shop

Lower Bound on the Makespan

Example 1

Flow Shop on 2 Machines

Flow Shop on 3 Machines

Flow Shop on 4+ Machines

LP Model

Example 2

Example 3

Example 4

Example 5

Example 6

The EOQ Model 1

Free

The EOQ Model 2

Free

The EOQ Model 3

Free

The EOQ Model 4

Free

The EOQ Model 5

Free

The EOQ Model 6

Free

EPQ 1

Free

EPQ 2

Free

EPQ 3

Free

EPQ 4

Free

EPQ 5

Free

EPQ 6

Free

Quantity Discount 1

Free

Quantity Discount 2

Free

Quantity Discount 3

Free

Material Requirements Planning 1

Free

Material Requirements Planning 2

Free

Material Requirements Planning 3

Free

Material Requirements Planning 4

Free

Alternative Lot Sizing Techniques 1

Free

Alternative Lot Sizing Techniques 2

Free

Alternative Lot Sizing Techniques 3

Free

Single Machine Scheduling 1

Free

Single Machine Scheduling 2

Free

Single Machine Scheduling 3

Free

Single Machine Scheduling 4

Free

Multiple Machine Scheduling 1

Free

Multiple Machine Scheduling 2

Free

Multiple Machine Scheduling 3

Free

Multiple Machine Scheduling 4

Free

Multiple Machine Scheduling 5

Free

Reviews

5

1 student review

Only students who have this course can review it.

Sudem Yaylacı

Bought the course

Endüstri Mühendisliği

12 months ago

slaytlara çalışırken neyin ne olduğunu bile bilmiyordum örnekler çok yardımcı oldu

Buy both together

🎓 92% of TED Üniversitesi students study with the whole bundle.

Manufacturing and Service Operations Planning I

IE 311 • Midterm II + Final

Manufacturing and Service Operations Planning I

5.0(1)
1499 TL1799 TL17%
Manufacturing and Service Operations Planning I

IE 311 • Midterm I

Manufacturing and Service Operations Planning I

5.0(1)
1499 TL1799 TL17%
599 TL off
Total:3598 TL2999 TL

Frequently asked questions about IE 311 Midterm II + Final

Frequently asked questions about Unicourse

1799 TL